
Riverstone Networks RS 32000 Switch Router Getting Started Guide 3-5
Hardware Installation Installing the Hardware
Warning Make sure there are at least 3 inches (7.62 centimeters) of room above and
behind the unit for air flow to the cooling fans.
Warning Make sure the screws are tight before your assistant releases the chassis. If
you accidentally leave the screws loose, the chassis can slip and fall, possibly
becoming damaged.
3.3.3 Installing AC Power Supplies
To install an AC power supply follow this procedure. For AC power supply environmental specifications, see
Table 3-2.
1. Ensure that the AC power supply is not powered on, and is disconnected from its line cord.
2. Position the power supply between the guides in an open power supply slot (see Figure 3-2).
Figure 3-2 Installing an AC power supply
3. Slide the AC power supply all the way into the slot, firmly but gently pressing to ensure that the
connectors on the back of the power supply are completely seated in the backplane.
4. Using a straight-blade screwdriver, turn the screw on the power supply’s front panel clockwise 180
degrees to lock the power supply into the chassis.
5. Attach the power cable to the AC power supply.
AC Power Supply
slides into chassis
between guide rails
Comentarios a estos manuales